Resources
EXN G19 03 Liquid Immersed Transformer IOM
Wed, 6 May 2026
AS 2067 Fire Protection Requirements Quick Reference Guide
Thu, 2 Apr 2026
Transformer Fire Risk Assessment Checklist
Wed, 4 Mar 2026
Environmental Design Checklist for Renewable Transformers
Mon, 16 Feb 2026
Exnovo Company Catalogue 2025
Tue, 15 Jul 2025
Drain Eezy Bund Filter Installation Guide V1 1
Fri, 4 Jul 2025
XNV Catalogue Step Up Transformer
Mon, 31 Mar 2025
Exnovo FM3990 Certificate
Fri, 31 Jan 2025
Exnovo Standard Terms Conditions
Thu, 1 Aug 2024
Exnovo GSM & AirTX Brochure
Wed, 30 Aug 2023
There is no user guides uploaded.
Blogs
Solving the 2026 Lead-Time Crisis: Why Modular Skid Transformers are the New Standard
Thu, 4 Jun 2026
The Exnovo Skid Auxiliary Transformer delivers a turnkey solution in just 30 weeks. This single-skid design turns months of risky on-site installation into a rapid, multi-day deployment.
110% bunding holds full oil plus a 10% buffer. But it’s a minimum. Rain, drainage issues, and jetting can still cause overflow. Systems like DrainEezy help keep containment safe and compliant.
AS 2067 Fire Protection Requirements: Essential Guide to Transformer Safety and Compliance
Thu, 2 Apr 2026
AS 2067 transformer fire protection in Australia: learn separation distances, fire barriers, and how K-class fluids reduce risk and footprint. A practical guide for engineers and facility managers to ensure compliance and protect assets.
Understanding Oil-Immersed Transformers: Benefits, Risks, and Maintenance
Wed, 4 Mar 2026
Oil-immersed transformers deliver high efficiency, strong load handling, and long service life. With GSM™ fire protection, they reduce risk, maintenance, and transformer life cycle cost for industrial and critical power systems.
From Design to Delivery: Engineering Transformers for Sustainable Energy and BESS
Fri, 30 Jan 2026
High-performance transformers for BESS, solar, and wind projects engineered for bi-directional power, harmonic resilience, and long-term reliability.
How to Choose the Right Transformer Supplier: A Complete Buyer’s Guide
Fri, 19 Dec 2025
Choosing the right transformer supplier goes beyond price, it’s about engineering expertise, safety compliance, installation support, and long-term life cycle cost that protects reliability for decades.
Factory Acceptance Tested (FAT) transformers give contractors peace of mind. Each unit is pre-tested to international standards to prevent costly onsite issues, delays, and safety risks.
From Factory to Field: The Journey of Every Transformer We Deliver
Fri, 7 Nov 2025
Every transformer we deliver goes through a precise five-stage process — from custom design to final testing — to ensure safety, reliability, and long-term performance.
Every certification we hold tells a story of safety, precision, and trust. From ISO 9001:2015 to ISO 45001:2018, these standards are the backbone of how we design, build, and deliver transformers that perform safely, reliably, and responsibly.
Need more information? Our team is ready to assist you.
ENQUIRE NOW!
Form Details
description-summary
| Mount Type | Insert Mount Type |
| Application | Insert Mount Type |
| Bushing Location | Insert Location |
| Winding | Insert Winding Perference |
| Size | 9999kVAkVA |
| Primary Voltage | 99kV |
| Secondary Voltage | 99kV |
| Vector group | Insert Ambient Term |
| Max Ambient Term | Insert Ambient Term |
| Tap changer | Insert Ambient Term |
| Cooling | Insert cooling |








